2000 Trans Am WS6 - LS1 Power Plan - Pontiac Tech
|
While the fluid is draining, RPM technician Manuel Bejar connects an A/C evacuation machine to the A/C fittings and proceeds to pull out the R-134 Freon. Once complete, the 10mm bolts attaching the A/C lines to the condenser and accumulator are removed. The radiator and condenser are held down by the lower airbox assembly. The airbox is removed by unscrewing the band clamp to lid connection, then removing the four 10mm bolts that hold the lower airbox to the core support. View Related Article
|
|
|
|