Classic Cubes From An LS1 Part 1
|
Before boring the block to accept the oversized Darton sleeves, it hasto be prepared. This includes placing the block under the proper load sothat critical dimensions are maintained during boring to carry over inthe final assembly. Daniel McCleskey, chief engine-building machinist atMTI removed the main bearings, installed the ARP main studs, and placedfour of the five main bearing caps in preparation for torquing. View Related Article
|
|
|
|